KSID Radio
Click to choose your station
Shop Here - Shop Now - SAVE BIG
Click to play Sky FM Click to play The Fort
SKY FM Stream The Fort AM Stream
News

Work to begin on US-385 north of Bridgeport

BRIDGEPORT, Neb. - Weather permitting, work is scheduled to begin April 23 on US?385, north of Bridgeport from Reference Post 75.11 to Reference Post 84.52.

According to the Nebraska Department of Transportation, the $3.7 million project will include bridge work, deck and curb repair with guardrail replacement on bridges at Reference Post at 75.39 and Reference Post 76.52, followed by milling and asphalt work.

There will be a 12-foot width restriction and reduced speeds. Traffic will be maintained with a pilot car and flaggers with a temporary traffic signal at the bridges. The work is scheduled to be completed by fall 2018.

The Department’s manager for this project is Tim Stevens of Bridgeport. Motorists are urged to use caution while driving through highway work zones and to remember that fines are doubled when workers are present.

 

#local

Comments
46° F
Sidney, NE
Copyright © 2018 KSID Radio
Designed and Hosted by RiverBender.com

KSID Radio
2306 Legion Park Road
P.O. Box 37
Sidney, Nebraska 69162

Phone: 308.254.5803
Toll Free: 800.322.5743
Fax: 308.254.5901